Saturday, 6th February, 2010
Work Party
A team from the church has been working at the building site today. Unfortunately I wasn't able to be there. They've been doing the stuff that needs doing by us before the builders come back to finish off the floors. This shot shows Alain in the foreground with Keith and François standing near the wall.
This is Alain again, he's working on what looks like one of the places where we're going to be putting a power socket.
Jean-Claude hard at work, though I'm not sure what he is doing. Some digging, it would seem. There is (was!) still quite a lot of builder's rubble that needed to be moved out of the building.
Pascal clearing branches. We have trees all down one edge of the property and they're not in particularly good shape. Plenty of wood to be moved and disposed of.
A "hard at work" photo where I don't have a clue as to what is actually being done. As trenches have to be dug for the heating pipes I'm guessing that's what was going on here.
A huge "Thank you" to everyone who made it down to the site today and put in so much effort! Particular thanks to François who organised the work and made sure that all the materials required for the job were in the right place at the right time.
Sorry, comments have been locked for this post.

