Wednesday, 14th July, 2010
More inside
I mentioned in my last post that we now have a back door, so here it is in all of its glory. The space to the right of the door going up to the top of the window will eventually be rendered - similar to what is there now but cleaner, and with insulation underneath.
Inside more building work has been going on. These are the walls for the toilets. There is still loads of space left over for the kitchen and a meeting room. It's all fairly bright and airy too. One of the nice things is that in the hot weather we've been having the inside the building has been quite cool. Should make things more bearable in the summer.
This is a trench dug from the road to the building. The electricity company will only lay the wires, they won't dig the holes, at least not on our property. I'm not quite sure why there are poles and tape around the trench. I would imagine that it's to do with health and safety - although the trench can't be more than about 12 inches deep.
Once again, thanks go out to Alain and François for all of their hard work. Last Friday François bought a whole new pallet of blocks and moved them into the building all on his own.
Sorry, comments have been locked for this post.