Sunday, 21st June, 2009
It's the little things...
A number of men from the church have been spending time working at the building site doing the smaller jobs that need to be done. So far they've put up a new fence, done lots of tidying up and built a border for what will eventually be a path down the side of the new hall.
Up until now I've not bothered to take a picture of the mound of earth that was created from digging out the foundations. Well, I was at the building last Thursday evening, it was bright and sunny so I thought I'd take a photo. The pile is about 2m high and has its own little eco-system.
We're now just waiting for the roofer to come. There was a small possibility that he would come in June but as the month draws to a close it looks like the roof won't be going on until August. July is a holiday month for Belgian builders. Anyway, it's not a huge problem, we're still on schedule and within our budget.